AMD Housing Developers
Sign in

AMD Sunshine

AMD Sunshine is another new project from AMD housing developers. Its a deluxe apartments consisting 16 units of 2 and 3 bedroom apartments, in Thiruvarur Bye pass road, Kandan nagar, Kumbakonam.

Sunshine Project Stilt and Floor Plan

Click the images to view the enlarged plan.
AMD Sunshine Floor Plan

Key Features

 • AMD Sunshine is adjacent to new Thiruvarur Bye pass road.
 • Just 1.5 km away from naal road junction.
 • Just 2 km away from Kumbakonam bus stand and Railway station.
 • Located in a green peaceful environment.
 • Free covered car parking.
 • Adequate two wheeler parking.
 • Vaasthu compliant.
 • Additional M.s Grill gate for entrance door and M.s grill for all balconies at no extra cost.

General Specification

  • Structure
  • : RCC framed structure.
  • Joineries
  • : Entrance door in Burma teak, other doors country wood framed phenolic bonded skin door, uPVC windows.
  • Electrical
  • : 3 phase power supply, modular switches.
  • Flooring
  • : Branded 2 ’ X 2 ’ vitrified tiles for halls and bedrooms.
  • Kitchen
  • : Branded 2 ’ X 2 ’ scratch free ceramic / vitrified tiles for flooring, Granite countertop with stainless steel sink.
  • Toilets
  • : Branded 2 ’ X 2 ’ glazed ceramic tiles for walls and 1 ’ X 1 ’ ceramic tiles flooring.
  • Painting
  • : White cement base wall putty with premium emulsion paint for interiors, enamel paint with wood primer for doors. Exterior emulsion          and cement paint for exteriors.
  • Water supply
  • : Separate arrangements for bore water& municipal water supply.
  • Lift
  • : 6 passenger semi automatic lift with power backup.

    Payment Terms

    1. Initial payment for booking. 10%
    2. At the time of registering Undivided share in land. 40%
    3. On completion of foundation work. 10%
    4. On completion of corresponding roof level. 15%
    5. At the time of starting cement plastering works. 10%
    6. At the time of starting flooring,electrical,plumbing works. 10%
    7. At the time of handing over.   5%

    Additional Cost

    1. Stamp duty & Registration fees.
    2. Water supply connection.
    3. 3 phase EB Connection.
    4. Assessment charges.
    5. Legal fees for bank loan.
    6. Service tax.
    7. UGD.
    8. VAT.

    Home | About us | Projects | FAQ | Contact Us | Privacy | Disclaimer | Sitemap